CASTELNOVO NE'MONTIImage

Monitoring of Castelnovo ne’ Monti bypass – Italy

LOCATION

Castelnovo ne’ Monti (RE), Italy

CLIENT

VE.I.CO.PAL. S.r.l.

RESPONSIBLE FOR MONITORING

VE.I.CO.PAL. S.r.l.

START OF THE MONITORING

August 2014

Agosto 2014


DESCRIPTION

Starting from 2014, the town of Castelnovo ne' Monti has been involved in the construction of a new ring road, designed to reduce the passage of heavy vehicles through the town centre.

The infrastructure is located on a slope, characterised by significant surface displacements.

Two MUMS Vertical Array systems were installed during 2014 to monitor the retaining wall and the ground upstream. The monitoring was completed during November 2016.

The site was instrumented with two Vertical Array tilt chains, with the following characteristics:

  • 12.5 m in length;
  • 21 Tilt Link V sensors (spaced 50 cm apart);
  • 1 Load Link (load cell);

A partire dal 2014, la città di Castelnovo ne' Monti è stata interessata dalla costruzione di una nuova tangenziale, pensata per ridurre il passaggio dei mezzi pesanti nel centro cittadino.

L'infrastruttura insiste su un pendio, caratterizzato da consistenti spostamenti di superficie.

Due sistemi MUMS Vertical Array sono stati installati durante il 2014 per monitorare il muro di contenimento e il terreno a monte. Il monitoraggio è terminato nel corso del novembre 2016.

Il sito è stato strumentato con due Vertical Array tilt chain, con le seguenti caratteristiche:

  • 12,5 m di lunghezza;
  • 21 sensori Tilt Link V (distanziati di 50 cm);
  • 1 Load Link (cella di carico);

During monitoring, the control unit interrogated the nodes at defined time intervals and saved the raw data on an SD card. The data was transmitted to the processing centre with a UMTS router, where automatic software processed it. The results were available within minutes on a web platform with security-controlled access.


DOWNLOADS

STRUCTURED SYSTEMS
SENSORS
CONTROL UNIT